A wardrobe works when the inside is planned before the shutters. We start with what you actually store, then choose the shutter system, fittings and finish around it.

  • Layout planned around what you store
  • Sliding, hinged and walk-in options
  • Hettich, Häfele and Blum fittings
  • Mirror, lacquered glass, acrylic and laminate shutters

How we approach this work

Wardrobe failures are rarely about the shutter. They come from a layout that ignores saree length, luggage or a growing shoe collection, and from fittings chosen for looks instead of load. We map the internal sections first (hanging, shelves, drawers, loft) and only then fix the shutter width and mechanism.

Sliding shutters save swing space in a bedroom, hinged shutters give full access at once, and walk-in layouts suit larger rooms. Finishes run from laminate and acrylic to lacquered glass, mirror and veneer, with aluminium edge profiles in matte black, champagne gold or bronze.

Brands we work with: Häfele · Hettich · Blum · Greenply · Century Ply · Greenlam · Labacha

Specifications

Shutter finishes
Laminate, acrylic, lacquered glass, mirror, veneer
Shutter thickness
6-18 mm depending on finish and width
Fittings
Soft-close hinges, channels and pull-outs
Internal
Hanging rods, drawers, shoe and tie racks, jewellery trays
Profiles
Aluminium edge and G-profiles in matte black, gold, bronze

Options we supply

01

Sliding wardrobes

Two or three shutters on top or bottom tracks, ideal where the bed or door leaves no swing space in the room.

02

Hinged wardrobes

Full-width access with soft-close hinges, better for smaller rooms where one section is opened at a time.

03

Walk-in and open wardrobes

Open sections, dresser units and island storage for larger bedrooms, planned as part of the room layout rather than a single wall unit.

04

Loft and utility storage

Overhead loft units and deep sections for luggage, spare bedding and seasonal items, using the height above the wardrobe.

How a project runs

  1. Step 1

    Layout discussion

    Storage needs and the available wall space are reviewed room by room before any drawing.

  2. Step 2

    Measurement

    Finished floor to ceiling height, wall plumb and skirting details are recorded on site.

  3. Step 3

    Fabrication

    Carcass and shutters are cut to size, with fittings matched to the shutter weight.

  4. Step 4

    Installation

    Units are levelled, fixed and aligned, and the shutter travel is adjusted.

Recent work

Wardrobe profiles and fittings displayed at the Hardware Solution showroom in Mondha
Wardrobe profiles and fittings at our showroom

Most wardrobe work is built to individual room layouts, so recent site photographs are shared on request rather than published here.

Frequently asked questions

Sliding or hinged, which wardrobe should I choose?

Sliding saves swing space and suits rooms where the bed faces the wardrobe. Hinged gives full access to the whole section at once and is usually more economical at the same width.

What depth does a wardrobe need?

Plan around 600 mm internal depth for sliding shutters and about 550 mm for hinged, so hangers sit without touching the shutter. Anything shallower needs a different internal layout.

How long does a modular wardrobe take?

Allow 15-20 days from advance payment for measurement, fabrication and installation. Wardrobes with imported fittings, mirror or lacquered glass can take longer depending on availability.

Can new shutters be fitted to an existing carcass?

Often yes, provided the carcass is square and can carry the new fitting loads. We inspect the existing structure before quoting, because an uneven carcass transfers movement to the new shutters.

Are mirror shutters safe in bedrooms?

Mirror is fixed to the shutter face with a protective backing and the frame carries the weight. It is a common finish for sliding wardrobes, but shutter width is limited so the mirror does not flex.

Talk to us about your site

Share the location and approximate sizes and we will schedule a measurement. Standard delivery is 15-20 days from advance payment, with billing on the actual measured area.